Ventus Energy delivered a full turnkey scope of cable pull-in, HV termination and testing services for a subsea cable connecting an offshore wind farm substation to a gas platform, taking the project from post-load-out testing through to a fully energised and authorised connection.

Project overview

Client
A subsea services contractor
Services
Cable pull-in and termination and testing
Location
North Sea
Project lead
Martin Hodgkiss, Project Manager
Completed
November 2025

The brief

The project involved the installation of a single 3-core, 33kV subsea cable, approximately 10km in length, connecting an offshore wind farm’s offshore substation to a gas platform. 

Ventus Energy was engaged to deliver the full scope of pull-in, termination and testing works.

Cores terminated at switchgear

Challenges

Delivering the project brought two main challenges:

  • Working with two different end clients, each with a different level of readiness and approach to the project, required Ventus to be adaptable with its methodology throughout the works

  • Frequent weather delays extended the project timeline, which in turn created personnel challenges as a result of European working-time legislation

Solution

Ventus deployed a team to deliver the full scope of HV cable work and fibre optic installation. The team:

  • Completed post-load-out testing before pre-rigging both platforms, ensuring all existing assets were protected ahead of the pull-in

  • Pulled in both ends of the 33kV cable, followed by post-pull-in testing to confirm cable integrity

  • Stripped, routed and cleated the three cable cores, installing inline joints above the hang-off before terminating each core at the switchgear

  • Installed fibre cable to the fibre panel and routed a new line through to the control room, with all connections tested against the project’s ITP

  • Tested all three power cores and compiled a complete As-Built documentation pack, alongside additional testing to support the client’s separate cable burial works

Outcome

The cable was successfully pulled in, terminated and tested end-to-end, with all fibre and power connections verified and a full As-Built pack delivered to support the handover process. 

The completed works enabled the relevant authorities to authorise the cable for service, and it was energised and confirmed to be operational.

Winch rigged for cable pull in

“This project required our expert team to collaborate with two end clients and a shifting weather-driven programme of work, without losing sight of the detail. Delivering the full scope of pull-in, HV termination and testing is an ideal example of the specialist capability Ventus offers on complex offshore cable projects.”

Martin Hodgkiss

Project Manager

“I just wanted to inform you that the cable has been energised and is currently operational. After a successful operational test and a check on the As-Built documentation, all authorities authorized the utilization of the cable. One more thank you for your effort and patience shown during the preparation and execution of the cable installation scope.”

Client project team

Benefits

  • Ventus taking on the complete scope - pull-in, HV termination, fibre works and testing - meant the customer didn’t need to bring in any additional contractor beyond the vessel provider, reducing the number of relationships to manage across the project

  • Technical guidance on HV and fibre optic best practice throughout the project

  • Advice on equipment selection to support the client’s cable burial activities

Cable hang off and core breakout
Cable cores routed and cleated
Cable entries and routing to overhead trays
Cable hang off and core breakout
Cores terminated at switchgear
N05 A as left survey
Phase identified cores on cable ladder
Switchgear termination with screen earthing
Winch rigged for cable pull in

Get in touch with Ventus Energy

If you'd like to chat about this case study or explore upcoming projects with the Ventus Energy team, please get in touch by completing this form.

ESC is an Enterprise Partner of the IET
Achilles UVDB Stamp Verified White
Iso 9001
Iso 45001
Iso 14001
Cyber Essentials Plus Logo